Page view 16
43D0121 17
Black
White
Blower
Plug
Junction Box
Factory Supplied
Not Supplied
Green
Black
120 VAC
Blower
120 VAC
Speed Control
ON/OFF
Wall
Switch
120 VAC/60 Hz
BTS
CAUTION
Electrical connections should only be performed by a qualified, licensed electrician,
main power must be off when connecting to main electrical power supply or
performing service.
The blower when installed, must be electrically grounded in accordance with
local codes or in the absence of local codes, with the National Electrical Code
ANSI/NFPA 70.
BLOWER INSTALLATION
BLOWER INSTALLATION
Install blower before framing firebox. Remove access panel on the floor of the firebox before installing the blower.
See Figure 30, page 18.
WIRING TO JUNCTION BOX
NOTE: The wire must be run to the junction box before framing the firebox.
1. Before installing blower, wire the receptacle into an electrical circuit. Use minimum 60°C wire in accordance
to prevailing codes.
2. The junction box is preinstalled at the factory. Remove external junction box cover by removing the screw from either
the left or right side of the outside firebox wall.
3. The junction box cover has a factory-installed “romex” style strain relief connector. Connect the wires according to the
wiring diagram below. Route the connected wire leads through the strain relief connector. See Figure 25.
Figure 25 - Wiring Diagram for Junction Box
Continued on page 18